Free Change Order Template
A change order records one thing: how the job and the price changed after the customer signed the original estimate. This template ties the change to the original estimate, shows credits for removed work next to the added work, and puts the net change and the new contract total above the signature line.
Download the template
- PDFBlank form to print and fill in by hand
- Word (.docx)Editable, with the example filled in
- Excel / Google Sheets (.xlsx)Net change and revised total calculate for you
Free, no email or sign-up. The Word and Excel files open in Google Docs and Google Sheets too.
Example: bathroom remodel: swap the vanity light for three recessed lights on a dimmer
This is the template filled in for a real kind of construction job.
Change order CO-03
August 4, 2026 · Changes estimate EST-1187
| Line item | Qty | Rate | Amount |
|---|---|---|---|
Credit: vanity light fixture install removed from scope Was on the original estimate; fixture not yet purchased | 1 | -$82.02 | -$82.02 |
Recessed downlight installed in an existing ceiling, per light (labor) Three lights over the vanity and shower | 3 | $102.52 | $307.56 |
Dimmer switch installed (dimmer included) Replaces the standard switch at the door | 1 | $96.29 | $96.29 |
Change order administration Revised drawings and schedule update | 1 | $32.18 | $32.18 |
Notes: Downlights are customer-selected. Work on this change starts only after it is signed. The schedule moves by one day.
Terms: The net change is added to the final payment on the original contract. All other terms of the original estimate stay the same.
Prices are examples only, before any sales tax, from a researched starter price book. The original contract total is illustrative. Use your own costs and rates.
What to put on a construction change order
The original estimate number
Every change order should name the estimate or contract it changes. Without it, a stack of signed changes cannot be added up at the end of the job.
Credits for work you are no longer doing
When one item replaces another, show the removed item as a credit line and the new item as its own line. The customer sees both sides of the swap instead of one unexplained number.
Net change and new total
Show the net change, the original contract total and the revised total. The revised total is the number both of you will check at the final invoice.
Schedule impact and signature
Say whether the change moves the finish date, and get a signature and date before the work starts. A change you do first and price later is the hardest one to collect.
Common mistakes
- Starting the extra work on a verbal yes and writing the change order afterward.
- Adding the new item without crediting the one it replaced.
- No reference to the original estimate, so changes cannot be reconciled at the end.
- Forgetting to say when the change gets paid: now, at the next milestone, or at the final payment.
Questions
Is this change order template free?
Are the prices in the example real?
When do I need a change order?
Can I do change orders on my phone?
Fill this in on your phone instead
Build the same change order in WorkSnap Pro from saved items and send it before you leave the job. Change orders in WorkSnap Pro are on paid plans.
Start freeThe Free plan is free forever. Paid plans come with a 14-day free trial, no credit card required. See pricing