Skip to main content

Estimates

How to write a plumbing estimate (worked two-sink example)

· 5 min read

Start a plumbing estimate with the fixture, the location and the part of the job you are taking responsibility for. “Replace two faucets” leaves out the detail most likely to change the bill. Who buys the faucets? A homeowner looking at two boxes on the kitchen table can reasonably expect a different price from someone who asked you to bring the fixtures.

Here is a worked estimate for two customer-supplied bathroom faucets. The figures are illustrative, before any applicable tax. Use your supplier costs, selling prices and labor rate when you write yours.

Put the job address and the two sinks on the estimate

Give the estimate a number and date. List the person who can approve the work, a way to reach them and the address where the work will happen. A billing address alone does little for the plumber trying to find the second sink. For this job, the locations are the hall bath on the first floor and the upstairs guest bath. The kitchen faucet stays.

Write the first sentence so the homeowner can check it while standing in the doorway. For example, “Remove the existing faucet at each of the two bathroom sinks listed below. Install the two faucets the customer has purchased. Supply four new connector lines. Check both installations for leaks and take away the old faucets.” That gives you a way to tell when this particular job is finished.

Decide what you need to see before you price it

Ask for the model numbers on the boxes and a picture of each sink, including the space underneath. A picture of the shiny new faucet tells you little about access inside the cabinet. If a drawer or shelf has to come out, decide who will clear it. Confirm whether either new faucet comes with a drain assembly the customer expects you to install. Spell out whether that work is in your price.

In this example the existing drains stay, both cabinets will be empty, and the existing shutoffs appear usable. Record those assumptions in a short sentence. If you cannot answer a question that would materially change the price, schedule a look or quote the known work and identify the open item. An unexplained “miscellaneous” charge gives the customer no way to choose.

Build the price the way the visit will actually run

This shop prices the visit as one scheduled trip, with setup and cleanup included in the labor hours. The trip line covers travel. Both faucets are already on site. The table shows the selling price for the job, so there is no second materials markup at the bottom.

Item Quantity Price per unit Amount
Travel for one scheduled visit 1 visit $45 $45
Remove and replace both faucets, including setup, leak check and cleanup 2.5 hours $96 $240
Supply connector lines 4 each $12 $48
Two customer-supplied faucets 2 each $0 $0
Estimated total before tax $333

Read the labor line out loud. It says 2.5 hours for both bathrooms together. If you wrote “faucet installation, $240 each” and then entered a quantity of two, you would add $240 more than you meant to charge. Check units on the materials too. If your supplier packages two connectors together, your customer-facing quantity can still be four individual connectors. Use the matching price per connector.

Tell the customer what could change the price

The estimate should answer the homeowner who asks, “What if the valve under the guest sink leaks?” A usable sentence for this job is “This price assumes the existing shutoffs can be reused. If a shutoff needs replacement, we’ll show you which one, price that work separately and ask for approval before proceeding.” That gives the customer a decision without charging every job for a possible repair.

Handle the customer-supplied fixtures just as plainly. Ask the homeowner to have both boxes and their parts at the house before the appointment. If a box is missing, the decision is whether to do one sink or move the visit. If your shop charges for a return trip, put the amount or the basis for it in the estimate before anyone books. A price for one visit does not explain the cost of two.

Revise the whole estimate if one faucet drops out

Suppose the homeowner decides to keep the upstairs faucet before work begins. Cutting $333 in half would give $166.50. But travel, setup and cleanup still happen. In this example the shop revises the labor to 1.5 hours for the hall bath. One visit is $45, labor is $144, and two connectors are $24. The revised estimate is $213 before tax, a reduction of $120.

Send the homeowner the shorter scope along with the new total. Keep the same job reference and give the revision a date or number. Mark which version you want approved. A text saying “take $120 off” is easy to find today and hard to match to the right bathroom when another plumber picks up the job next week.

Give the customer one clear next step

End with the estimate’s validity date, how to accept it and when you expect payment under the terms you offered. If the customer still has to decide between one sink and two, ask that question before asking them to approve. Leave scheduling details specific enough that they know whether approval reserves a visit or whether you will contact them about a date.

For a final check, cover the total and read the scope. Could another plumber pack the right number of connectors, find the right bathrooms and tell the customer what happens if a shutoff needs work? Then cover the scope and add the table. Those two checks catch different mistakes. Start your own version with the free plumbing estimate template. If you prepare estimates in WorkSnap Pro, the plumber page is the place to start, and creating estimates covers the steps in the app.

Write estimates and invoices from your phone

Build them from saved items, get them signed, and send them before you leave the job.

Start free

The Free plan is free forever. Paid plans come with a 14-day free trial, no credit card required. See pricing