Skip to main content

Getting paid

How much deposit should a contractor charge? Percentages, milestones and how to show the balance

· 4 min read

Asking for a deposit feels awkward until you realize most customers expect it. The ones who refuse a reasonable deposit are often the ones who will be difficult about the final invoice. A clear deposit policy protects your cash flow and filters for serious customers.

How much to ask for

There is no single correct percentage, but these ranges are common and defensible:

  • Small service calls under $500: no deposit, or 50 percent if you are ordering parts.
  • Standard jobs $500 to $5,000: 30 to 50 percent.
  • Larger projects over $5,000: 30 to 40 percent, sometimes split into two deposits.
  • Jobs that require special-order materials: enough to cover the materials plus a little labor.

State the percentage or the dollar amount on the estimate so it is not a surprise at the end of the conversation.

Some states cap residential deposits (for example, a fixed percentage or dollar limit before work starts). Check your state contractor board rules before you set a default; this article is not legal advice.

Worked example

You quote a water heater replacement at $1,674 (see the numbers in the plumbing estimate guide). You ask for a 40 percent deposit: $670.

You write on the estimate:

"Deposit of $670 due to schedule the work and order the unit. Balance of $1,004 due on completion."

The customer signs the estimate. You send a payment link for the $670. They pay with a card through Stripe, PayPal, or Square before you leave the driveway or before you order the heater. You now have the material cost covered and a committed customer.

If the job is larger, you can use a payment schedule instead of a single deposit. Example for a $12,000 bathroom remodel:

  • 30 percent deposit to start ($3,600)
  • 40 percent at rough-in ($4,800)
  • 30 percent at final ($3,600)

Each milestone is listed on the estimate or on a simple schedule the customer sees before they sign.

How to ask without losing the job

  • Put the deposit on the estimate before you discuss it out loud. The written number feels normal.
  • Explain what the deposit covers: "This covers the unit and gets you on the schedule."
  • Offer a payment link so they can pay from their phone in thirty seconds.
  • Have a consistent policy. If you sometimes waive the deposit, customers will ask you to waive it every time.
  • For very small jobs, skip the deposit and invoice on the spot. The goal is cash flow, not bureaucracy.

What to do if they hesitate

Most hesitation is about trust, not the amount. You can:

  • Offer to start with a smaller deposit that still covers materials.
  • Show them your license, insurance, and a couple of recent job photos.
  • Explain that the deposit is applied to the final invoice; it is not an extra fee.

If they still refuse any deposit on a job that requires special-order parts, it is usually safer to walk away or to require full payment for the materials up front.

After the deposit is paid

Record the deposit against the estimate or the job the day it arrives. When you write the final invoice, show the deposit already received so the balance due is right and nobody has to remember what was paid.

A clear deposit process is one of the fastest ways to improve cash flow. It also reduces the number of jobs that stall because the customer was never fully committed.

WorkSnap Pro lets you add a deposit or a full payment schedule to any estimate. Connect Stripe, PayPal or Square and the customer can pay it online from a link, on any plan. The Free plan is free forever. Paid plans come with a 14-day free trial, no credit card required.

Tracking deposits across multiple jobs

Once you have more than a few jobs in progress, it is easy to lose track of who has paid the deposit and who has not. Keep the deposit tied to the specific estimate or job so the balance due is always correct. When you write the final invoice, check that the deposit shows as paid before you send it.

If a customer pays the deposit by check or cash, record it the same day so your reports stay accurate. Card payments through a processor update automatically.

What the deposit does not cover

A deposit is not a gift. It is an advance payment that is applied to the final invoice. If the customer cancels before any work starts, your policy should say whether the deposit is refundable, partially refundable, or non-refundable if materials have already been ordered. Put that policy in writing on the estimate.

Building the habit

The first week you ask for deposits on every job over a certain size will feel awkward. After that it becomes normal. Customers who have worked with other contractors expect it. The ones who are surprised usually appreciate the clarity once you explain what the money is for.

Start with your next three estimates. Put the deposit amount in writing, send a payment link, and see how many people pay before you schedule the work. Most contractors find that collection rates on the final invoice improve once the deposit habit is in place.

Write estimates and invoices from your phone

Build them from saved items, get them signed, and send them before you leave the job.

Start free

The Free plan is free forever. Paid plans come with a 14-day free trial, no credit card required. See pricing